Bela Bela Solar Park C&I / wheeling
High confidence construction Last researched: 2026-06-25
~12,768 piles to drive (est.)
91.2 MWdc × 140 piles/MWdc (single-axis), ±15%. The JCS500 drives 4 m solar piles (auger + DTH). Not a quote.
| Capacity | 75 MWac / 91.2 MWdc |
|---|---|
| Location | Limpopo, ZA (coordinates approximate) near Bela-Bela / Eskom Warmbad substation — refine from EIA corner coordinates when sourced |
| Developer | Sturdee Energy (sturdee-energy.com · LinkedIn) |
| EPC / contractor | not yet confirmed |
| Grid / substation | Eskom Warmbad |
| Distance from Mokopane | ~105 km straight-line |
Data complete to the best of our current research. Spotted something we missed? Use the button below.
Sources
- Sturdee Energy — project page (2026-06-25)
- Ecofin — financial close (91 MW, Limpopo) (2026-06-25)
Bidding or building this site? A 12-week rig import lead-time can sink a programme. Drillbuilders has JCS500 solar piling rigs in stock now in Mokopane — no import wait.
Reserve a JCS500 for the Bela Bela Solar Park programme JCS500 full specs →Planning intel compiled from open-source data — not a tender document. Suggest a correction or add missing info →