Jwaneng Solar SADC cross-border
High confidence construction Last researched: 2026-06-25
~18,200 piles to drive (est.)
130.0 MWdc × 140 piles/MWdc (sadc), ±15%. The JCS500 drives 4 m solar piles (auger + DTH). Not a quote.
| Capacity | 100 MWac / ~130.0 MWdc (DC estimated from AC) |
|---|---|
| Location | Southern District, BW ~171 km west of Gaborone, Botswana |
| Developer | Sinotswana Green Energy |
| EPC / contractor | not yet confirmed |
| Grid / substation | Botswana Power Corporation |
| Distance from Mokopane | ~441 km straight-line |
Data complete to the best of our current research. Spotted something we missed? Use the button below.
Sources
- Wikipedia — Jwaneng Solar Power Station (2026-06-25)
- pv magazine — Botswana 100 MW solar contract (2026-06-25)
Bidding or building this site? A 12-week rig import lead-time can sink a programme. Drillbuilders has JCS500 solar piling rigs in stock now in Mokopane — no import wait.
Reserve a JCS500 for the Jwaneng Solar programme JCS500 full specs →Planning intel compiled from open-source data — not a tender document. Suggest a correction or add missing info →