High confidence construction Last researched: 2026-06-25

~18,200 piles to drive (est.)
130.0 MWdc × 140 piles/MWdc (sadc), ±15%. The JCS500 drives 4 m solar piles (auger + DTH). Not a quote.
Capacity100 MWac / ~130.0 MWdc (DC estimated from AC)
LocationSouthern District, BW
~171 km west of Gaborone, Botswana
DeveloperSinotswana Green Energy
EPC / contractornot yet confirmed
Grid / substationBotswana Power Corporation
Distance from Mokopane~441 km straight-line
Sources

Bidding or building this site? A 12-week rig import lead-time can sink a programme. Drillbuilders has JCS500 solar piling rigs in stock now in Mokopane — no import wait.

Reserve a JCS500 for the Jwaneng Solar programme JCS500 full specs →