ASE, Neels Audie How a SAR100 gets built — six phases, from signed brief to 200 m borehole rig SAR100 · Built for drilling contractors (names withheld) · Built in Mokopane, Limpopo, South Africa · Builds pictured: 2021–2026 · Typical build: 2–6 weeks The SAR100 is our compact truck-mounted wate... 10 juil. 2026