Pular para o conteúdo

← Back to all solar projects

Cuamba Solar + BESS SADC cross-border

High confidence operational Last researched: 2026-06-26

~2,660 piles to drive (est.)
19 MWdc × 140 piles/MWdc (sadc), ±15%. The JCS500 drives 4 m solar piles (auger + DTH). Not a quote.
Capacity15 MWac / 19 MWdc
Storage (BESS)2 MW / 7 MWh
LocationNiassa Province (Cuamba, Tetereane), Mozambique (coordinates approximate)
From Wikipedia coordinates 14°48'01"S, 36°30'22"E for the Cuamba/Tetereane site, Niassa Province. Single-source, treated as approximate.
DeveloperGlobeleq (with Source Energia and EDM) (globeleq.com · LinkedIn)
Owner / equityCentral Eléctrica de Tetereane SA (CET) — SPV majority-owned by Globeleq, with EDM holding 15% equity; Source Energia (Source Capital, Mauritius) also an investor
EPC / contractorTSK Group (Spain) (tskgroup.co.uk · LinkedIn)
OfftakerElectricidade de Moçambique (EDM) — 25-year PPA
Regulatory routeIndependent Power Producer (IPP) under a 25-year PPA with state utility EDM; first utility-scale solar+storage IPP in Mozambique. Backed by EAIF/PIDG concessional debt + viability gap funding (not REIPPPP/SAPP-merchant).
Key datesFinancial close: 2021-12; Construction start: 2021; Commissioning / COD: 2023-09
Distance from Mokopane~1,307 km straight-line
Sources
Research notes

Mozambique's first utility-scale solar+storage IPP and Globeleq's first greenfield in Mozambique. US$36m, ~22,000 families. BII/MIGA backed. CONFIRMED EXISTS — Mozambique's first utility-scale solar-plus-storage IPP, in commercial operation since 12 Sep 2023. Core facts corroborated by multiple independent sources (Globeleq, Wikipedia, EAIF/PIDG, pv-magazine, energy-storage.news), no major unresolved conflict — hence high confidence. CAPACITY: Consistently reported as 19 MWp (DC) / 15 MWac. Wikipedia's infobox loosely states "20 megawatts" but every financial-close and project source (Globeleq, EAIF, pv-magazine, SolarQuarter) says 19 MWp DC — I treat 19 MWp/15 MWac as authoritative; the "20 MW" is rounding, not a true conflict. STORAGE: Energy capacity consistently 7 MWh. Power rating less clearly stated: one financial-close summary cites ~2 MW BESS power; Wikipedia garbles it as "1.86 MVA / 7.42 MW/h". I recorded storage.mw=2 (approximate, single-source) and mwh=7 (well-corroborated). Treat the 2 MW as a lower-confidence figure. OWNER/SPV: Owner & operator is the SPV Central Eléctrica de Tetereane SA (CET), majority-owned by Globeleq, with EDM holding 15% of equity (EAIF). Source Energia (appearing as 'Source Capital, Mauritius' on Wikipedia) is the third partner/investor. Seed's 'developer=Globeleq + Source Energia + EDM' is correct as the partner group. EPC: TSK Group (Spain) awarded EPC in May 2021; also contracted for O&M for the first 5 years (Wikipedia). FINANCING: US$36m total. Debt from Emerging Africa Infrastructure Fund (EAIF, PIDG) US$19m; PIDG Viability Gap Funding grant US$7m; BII Plus (British International Investment) US$1m grant toward the BESS. Seed note said 'BII/MIGA backed' — BII involvement confirmed (BII Plus grant), but I found NO source corroborating MIGA involvement; do not assert MIGA without evidence. DATES: Financial close Dec 2021; EPC awarded / groundbreaking 2021; commercial operation date 12 Sep 2023 (Globeleq formal EDM notification). GEO: Site near Tetereane, Cuamba district, Niassa Province (~550 km west of Nacala). Coordinates -14.8003, 36.5061 from Wikipedia only — flagged approximate (single source, not independently verified against imagery). No geotechnical/soil information found in any source. VERIFY: Adversarial check (2026-06): existence, capacity (19 MWp DC / 15 MWac), 7 MWh storage, developer trio (Globeleq + Source Energia + EDM), TSK Group EPC, EDM 25-yr PPA, and COD Sep 2023 all independently corroborated across Globeleq, EAIF/PIDG, Wikipedia, pv-magazine, Engineering News, SolarQuarter, PRNewswire — high confidence. UNRESOLVED SPV-name conflict: EAIF says SPV='Central Eléctrica de Tetereane SA (CET)' with EDM 15%; Wikipedia says SPV='Cuamba Solar Company (CSC)', Globeleq+Source Capital only — overlay follows the more authoritative EAIF version but the owner field mixes sources; do not over-assert. storage.mw=2 kept but LOW confidence (single-source; Wikipedia's '1.86 MVA / 7.42 MW/h' is garbled) — energy 7 MWh is solid. geo coords kept but SINGLE-SOURCE (Wikipedia only), unverified against imagery — treat as approximate. PRIOR-REFUTATION PRESERVED: seed note's 'MIGA backed' could NOT be corroborated (no MIGA evidence found); BII involvement IS confirmed (BII Plus US$1m BESS grant) — do not publish MIGA. No geotechnical/soil data found in any source. CONFLICTS: SPV/owner name conflict: EAIF/PIDG names the SPV 'Central Eléctrica de Tetereane SA (CET)' with EDM holding 15% equity; Wikipedia instead names the SPV 'Cuamba Solar Company (CSC)' with equity holders Globeleq + Source Capital only (EDM not listed). Overlay follows the EAIF version (the primary financing source), which is the more authoritative, but the discrepancy is unresolved and the owner string mixes both. ; storage.mw=2 is single-source and approximate; Wikipedia garbles the BESS power rating as '1.86 MVA / 7.42 MW/h'. The 2 MW power figure is low-confidence (energy 7 MWh is well corroborated). ; Capacity 'rounding' discrepancy: Wikipedia infobox states '20 MW' nameplate, while Globeleq/EAIF/pv-magazine/SolarQuarter consistently report 19 MWp DC / 15 MWac. Treated as rounding, not a true conflict. ; geo coordinates (-14.8003, 36.5061) are SINGLE-SOURCE (Wikipedia only), matching Wikipedia's 14°48'01"S 36°30'22"E exactly but not independently verified against satellite imagery. ; Project cost: an EPC-era source (Wikipedia/groundbreaking) cited US$32m; financial-close and COD sources cite US$36m. Overlay uses $36m (resolved, minor). ; Seed note's 'MIGA backed' claim is UNVERIFIED: no source corroborates MIGA involvement. BII (BII Plus US$1m BESS grant) IS confirmed; MIGA is not. Overlay correctly declines to assert MIGA.

Bidding or building this site? The JCS500 solar piling rig is built to order in our Mokopane workshop — talk to us early to secure a build slot for your programme.

Reserve a JCS500 for the Cuamba Solar + BESS programme JCS500 full specs →

Planning intel compiled from open-source data — not a tender document. Suggest a correction or add missing info →

Chat with us