Pular para o conteúdo

← Back to all solar projects

Bela Bela Solar Park C&I / wheeling

High confidence construction Last researched: 2026-06-25

~12,768 piles to drive (est.)
91.2 MWdc × 140 piles/MWdc (single-axis), ±15%. The JCS500 drives 4 m solar piles (auger + DTH). Not a quote.
Capacity75 MWac / 91.2 MWdc
LocationLimpopo, ZA (coordinates approximate)
near Bela-Bela / Eskom Warmbad substation — refine from EIA corner coordinates when sourced
DeveloperSturdee Energy (sturdee-energy.com · LinkedIn)
EPC / contractornot yet confirmed
Grid / substationEskom Warmbad
Distance from Mokopane~105 km straight-line
Sources

Bidding or building this site? The JCS500 solar piling rig is built to order in our Mokopane workshop — talk to us early to secure a build slot for your programme.

Reserve a JCS500 for the Bela Bela Solar Park programme JCS500 full specs →

Planning intel compiled from open-source data — not a tender document. Suggest a correction or add missing info →

Chat with us